Great company to work with. Professional, reliable and well organised from start to finish. Communication is always clear, sites are well run & the team are a pleasure to deal with. I wouldn’t hesitate to recommend them and look forward to working together again!
Read more on GoogleExpert Groundworks and Drainage in Hayle
Hayle does not sit on the same ground as the granite towns either side of it, and a foundation or a soakaway here has to answer to what is actually under the plot. We open it up and find out first.
Specialist Groundworks and Foundations for Hayle Estuary and Towans Ground
Groundworks in Hayle varies more over a short distance than anywhere else on this stretch of coast.
Copperhouse, Foundry, North Quay, the Towans and the villages behind them are not one ground condition. Blown sand and dune, silt near the estuary, and made ground where two centuries of industry filled, quayed and reworked the waterfront: the town sits inside the Cornwall and West Devon Mining Landscape World Heritage Site for good reason, and that history is under the plots as well as around them. A hundred metres can change what a foundation has to be, which is why BS 8004, the code of practice for foundations, is a matter of proving the bearing stratum rather than assuming it.
The estuary decides the water. It is a protected tidal system, so where surface water is allowed to go is part of the design and not an afterthought, and a soakaway only works where the ground will actually take it. With harbour regeneration and new build plots still coming forward around Phillack, Angarrack, Gwithian and Connor Downs, that pairing, an unknown ground profile and a fixed drainage strategy, is the Hayle job in one sentence.
Our Groundworks, Drainage and Construction Services in Hayle
Most Hayle enquiries start below ground level, and several of the villages around the town are off mains drainage.
Site clearance, excavation to formation, muck away and foundations, with the dig used to prove what the plot actually sits on before anything is built back.
Foundations, slabs, formwork and steel fixing to the engineer's design.
Extensions, renovations and new build plots, taken from cleared ground to finished structure.
Foul and surface water runs, land drainage and attenuation, designed around where the water is permitted to go rather than where it is easiest to send it.
Soakaway design and installation on ground that has been tested rather than assumed, sized to the area it has to serve.
Installation and replacement for properties off mains drainage in the villages around the town, including the groundworks either side of the tank.
Why Hayle Developers and Homeowners Choose Cornwall Civils & Construction
One contract across clearance, groundworks, drainage and buildThe same contractor holds the programme all the way through, so nothing on a Hayle plot stops while two firms agree whose scope it was.
A director who prices the job and then digs itMatt Richards runs the site and operates the machine, so what was allowed for at the quote is known first hand on the day.
Delivered to architects' and engineers' detailSetting out, reinforcement and concrete grade to the drawing, including work under external structural engineers' direction.
A written quote before anything is booked inScope, sequence and the conditions that would change the price, in writing.
The Groundworks and Drainage Work a Hayle Site Asks For
Hayle work starts below ground: foundations taken to a stratum that has been proved, soakaways where the ground will take water, and surface water routed away from the estuary rather than into it. The nearest comparable work is elsewhere in west Cornwall, including 26 metres of soakaway installed in stages and three attenuation tanks built into the St Ives retaining wall scheme.
Google Reviews You Can Read for Yourself
We would rather you checked the profile than took our word for it, so the feed below is live rather than a selection.
Based on 5 Google reviews
Cornwall Civils have been working on a complex external works package for our project in St Ives. Their works have included an extensive concrete retaining wall, in-situ concrete stairs and an in-ground modular drainage system.
Read more on GoogleCornwall Civils handled a tricky concrete shuttering, steel work, and pour for us on an emergency job. They stepped in at very short notice and worked through nights and weekends to get it done. The quality of their work was excellent, and their commitment was outstanding.
Read more on GoogleI recently had the pleasure of working with Matry at Cornwall Civils and Construction, and I couldn’t be more impressed with the service provided.
Read more on GoogleOne further five-star rating was left on Google without a written review.
Groundworks and Drainage in the Towns Around Hayle
Hayle sits on the run between our base at Newlyn and the towns inland, so the area either side is regular working ground.
Frequently Asked Questions
Do you cover Phillack, Angarrack, Gwithian and Connor Downs?+
How quickly can you get to Hayle?+
Do you install soakaways and surface water drainage in Hayle?+
Who will actually be on site?+
Get a Written Quote for Groundworks in Hayle
Send the postcode, the drawings and the stage the site is at. If nobody has opened the ground yet, say so, because on a Hayle plot that is usually the first thing worth doing.
Call Matt Richards on 07958 102538 · Get a free quote online
14 The Strand, Newlyn, Penzance, TR18 5HN
Phone: 07958 102538
Email: info@cornwallcivilsandconstruction.co.uk
Hours: Mon to Fri 07:00 to 17:00 · Sat 08:00 to 12:00
Sunday: emergency call out only
Last updated: 22 September 2026


